Construction on the Active Living Centre in Vernon, B.C. has reached a milestone with the pouring of the first concrete batch after weeks of excavation and site preparation. Over 300 cubic metres of concrete were poured, which took six hours and 30 truckloads to complete. The centre is expected to open in the fall of 2026, with the project budgeted at $135.9 million. Mayor Victor Cumming expressed excitement about the progress, stating that the new facility is designed to promote health and well-being for Vernon’s growing community.
The Active Living Centre, located on the former Kin Race Track lands, will cater to people of all ages and offer spaces for aquatics, various sports, fitness classes, and social activities. Since breaking ground in April, the focus has been on site preparation, utility installation, and constructing outbuildings. Project manager Doug Ross emphasized the significance of the first major concrete pour, calling it a pivotal moment in the construction of the centre. The facility is aimed at providing modern and inclusive recreational opportunities for the community.
The construction of the Active Living Centre is a part of the city’s commitment to deliver a new facility that meets the needs of residents, promotes a healthy lifestyle, and enhances the quality of life in Vernon. The project has been progressing steadily since the groundbreaking, with a strong emphasis on creating a space that fosters community well-being. With various amenities and programs planned, the centre aims to serve as a hub for active living, social engagement, and overall wellness for individuals and families in the area.
Mayor Victor Cumming highlighted the importance of the concrete pour as a tangible sign of progress towards realizing the vision for the Active Living Centre. He reiterated the council’s dedication to creating a modern, accessible, and inclusive recreation facility that will benefit the entire community. The construction process has been carefully planned to ensure that the centre meets the diverse needs and interests of Vernon residents, making it a vital addition to the city’s infrastructure and recreational offerings.
The Active Living Centre is strategically positioned to enhance the recreational landscape of Vernon, providing a versatile space for residents to engage in various physical activities, wellness programs, and social gatherings. With a focus on inclusivity and accessibility, the facility aims to cater to individuals of all ages and abilities, fostering a sense of community and promoting healthy lifestyles. The city anticipates that the completed centre will become a hub for active living and social interaction, contributing to the overall well-being and vitality of Vernon’s residents.
In conclusion, the construction milestone of the Active Living Centre in Vernon marks a significant step towards the realization of a modern and multi-functional recreation facility. With the pouring of the first concrete batch, the project is on track to open in the fall of 2026 within the approved budget. The centre’s design and amenities reflect a commitment to promoting health, well-being, and community engagement, making it a valuable addition to Vernon’s recreational infrastructure. As work progresses on the construction site, the city looks forward to the completion of the Active Living Centre as a space that will enhance the quality of life for residents and contribute to a vibrant and active community in Vernon.