Close Menu
West TimelinesWest Timelines
  • News
  • Politics
  • World
    • Africa
    • Asia
    • Australia
    • Europe
      • United Kingdom
      • Germany
      • France
      • Italy
      • Russia
      • Spain
      • Turkey
      • Ukraine
    • North America
      • United States
      • Canada
    • South America
  • Business
    • Finance
    • Markets
    • Investing
    • Small Business
    • Crypto
  • Elections
  • Entertainment
  • Health
  • Lifestyle
    • Fashion
    • Food & Drink
    • Travel
    • Astrology
  • Weird News
  • Science
  • Sports
    • Soccer
  • Technology
  • Viral Trends
Trending Now

UAE Ranks Among Top Rugby Markets on TOD as British & Irish Lions Tour Kicks Off

1 week ago

Darven: A New Leap in AI-Powered Legal Technology Launching from the UAE to the World

2 weeks ago

Jordan to Host Iraq in the Final Round of the Asian World Cup Qualifiers After Securing Historic Spot

1 month ago

فلسطين: قلبٌ ينبض بالصمود والأمل

2 months ago

Roland Garros 2025: A New Era of Viewing, A Tribute to Legends, and Moments to Remember

2 months ago
Facebook X (Twitter) Instagram
West TimelinesWest Timelines
  • News
  • US
  • #Elections
  • World
    • North America
      • United States
      • Canada
    • Europe
      • United Kingdom
      • Germany
      • France
      • Italy
      • Spain
      • Ukraine
      • Russia
      • Turkey
    • Asia
    • Australia
    • Africa
    • South America
  • Politics
  • Business
    • Finance
    • Investing
    • Markets
    • Small Business
    • Crypto
  • Lifestyle
    • Astrology
    • Fashion
    • Food & Drink
    • Travel
  • Health
  • Sports
    • Soccer
  • More
    • Entertainment
    • Technology
    • Science
    • Viral Trends
    • Weird News
Subscribe
  • Israel War
  • Ukraine War
  • United Kingdom
  • Canada
  • Germany
  • France
  • Italy
  • Russia
  • Spain
  • Turkey
  • Ukraine
West TimelinesWest Timelines
Home»World
World

A robot’s mission to retrieve melted fuel from Japan’s damaged nuclear reactor put on hold

11 months agoNo Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Telegram Email WhatsApp Copy Link

A recent attempt to remove a fragment of melted fuel from the Fukushima Daiichi nuclear power plant’s wrecked reactor was suspended due to a technical issue. The debris removal phase is regarded as the most challenging part of the plant’s decades-long decommissioning process, following the destruction of three reactors in the 2011 tsunami disaster. The operation involved the use of an extendable robot equipped with tongs to collect a sample from the surface of the melted fuel mound within the reactor’s primary containment vessel. The robot was remotely operated from a safe location, but the mission had to be stopped due to a mistake in the positioning of pipes used to maneuver the robot, which could not be corrected within the allotted time for radiation exposure.

The Japan’s Tokyo Electric Power Company Holdings (TEPCO) responsible for the Fukushima Daiichi nuclear power plant said that the pipes used to push the robot inside and pull it back out were mistakenly placed in the wrong order, leading to the suspension of the operation. The robot, capable of extending up to 22 meters, had a device equipped with tongs to collect less than 3 grams of highly radioactive molten fuel from the debris inside the reactor. TEPCO spokesperson Kenichi Takahara described the positioning of the pipes as a “basic mistake” and stated that the retrieval mission would only resume once a thorough investigation was conducted to identify the cause of the problem and implement preventive measures to avoid similar incidents in the future.

TEPCO’s President, Tomoaki Kobayakawa emphasized that safety was the priority over rushing the process of debris removal. The goal of retrieving a small sample of the melted fuel debris is to provide essential data for the development of future decommissioning methods, technologies, and robots necessary for the cleanup of the wrecked reactors and the entire plant. The Japanese government and TEPCO have maintained a 30 to 40-year cleanup target despite criticism of its feasibility, with no specific plans yet decided for the full removal or storage of the highly radioactive debris. Experts emphasize the importance of better understanding the melted fuel debris to facilitate the decommissioning process of the Fukushima Daiichi nuclear power plant.

According to TEPCO, the mission to collect a tiny sample of the melted fuel within the reactor and return with it was expected to last for two weeks, but the start date for the operation remains undecided. The operation, once resumed, will provide crucial data that will aid in the long-term decommissioning process of the Fukushima Daiichi plant. Despite challenges and setbacks in the cleanup efforts, including technical issues with the robot used for debris removal, the focus remains on ensuring the safe and effective removal of the highly radioactive material within the reactors. With continued efforts and advancements in technology and robotics, experts believe that progress will be made towards the ultimate goal of decommissioning the Fukushima Daiichi nuclear power plant.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest Email Telegram WhatsApp Copy Link

You Might Like

Array

Array

Array

Array

Array

Array

Editors Picks

Darven: A New Leap in AI-Powered Legal Technology Launching from the UAE to the World

2 weeks ago

Jordan to Host Iraq in the Final Round of the Asian World Cup Qualifiers After Securing Historic Spot

1 month ago

فلسطين: قلبٌ ينبض بالصمود والأمل

2 months ago

Roland Garros 2025: A New Era of Viewing, A Tribute to Legends, and Moments to Remember

2 months ago

Array

2 months ago

Latest News

Array

2 months ago

Array

2 months ago

Array

2 months ago
Advertisement
Facebook X (Twitter) TikTok Instagram Threads
© 2025 West Timelines. All Rights Reserved. Developed By: Sawah Solutions
  • Privacy Policy
  • Terms
  • Contact

Type above and press Enter to search. Press Esc to cancel.