Close Menu
West TimelinesWest Timelines
  • News
  • Politics
  • World
    • Africa
    • Asia
    • Australia
    • Europe
      • United Kingdom
      • Germany
      • France
      • Italy
      • Russia
      • Spain
      • Turkey
      • Ukraine
    • North America
      • United States
      • Canada
    • South America
  • Business
    • Finance
    • Markets
    • Investing
    • Small Business
    • Crypto
  • Elections
  • Entertainment
  • Health
  • Lifestyle
    • Fashion
    • Food & Drink
    • Travel
    • Astrology
  • Weird News
  • Science
  • Sports
    • Soccer
  • Technology
  • Viral Trends
Trending Now

3 Special Awards Announced at the MICHELIN Guide Restaurant Celebration Saudi Arabia 2026

2 months ago

RING LAUNCHES NEW AI-POWERED SMART VIDEO SEARCH IN THE UAE

3 months ago

Dubai Spotlight: Analyzing the Evolving Audience Tastes with AI Social Listening Tools in the UAE

4 months ago

مرآة التاريخ: تحليل البناء السردي للدروس الخالدة في قصص الأنبياء والإسلام

4 months ago

السندات الحكومية والشركات: أساسيات الاستثمار الآمن والدخل الثابت

5 months ago
Facebook X (Twitter) Instagram
West TimelinesWest Timelines
  • News
  • US
  • #Elections
  • World
    • North America
      • United States
      • Canada
    • Europe
      • United Kingdom
      • Germany
      • France
      • Italy
      • Spain
      • Ukraine
      • Russia
      • Turkey
    • Asia
    • Australia
    • Africa
    • South America
  • Politics
  • Business
    • Finance
    • Investing
    • Markets
    • Small Business
    • Crypto
  • Lifestyle
    • Astrology
    • Fashion
    • Food & Drink
    • Travel
  • Health
  • Sports
    • Soccer
  • More
    • Entertainment
    • Technology
    • Science
    • Viral Trends
    • Weird News
Subscribe
  • Israel War
  • Ukraine War
  • United Kingdom
  • Canada
  • Germany
  • France
  • Italy
  • Russia
  • Spain
  • Turkey
  • Ukraine
West TimelinesWest Timelines
Home»World»Australia
Australia

Beach Energy stocks plummet due to cost overrun and delay in Waitsia gas plant construction

April 8, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Telegram Email WhatsApp Copy Link

Beach Energy shares experienced a significant drop of 16 per cent in early trading due to news of poor construction at a West Australian plant, resulting in major cost increases and a potential delay of up to a year. The plant, located 370 kilometers north of Perth, is meant to process gas from the onshore Waitsia field. The estimated cost for the construction of the plant has risen to $600-$650 million, which is $150 million more than a revised estimate from a year prior and $250 million greater than the original estimate in late 2020. Waitsia had controversially gained an exemption from the ban on exports of onshore gas.

Beach Energy’s chief executive, Brett Woods, expressed disappointment over the quality issues encountered at the Perth Basin project. The company holds a 50 per cent stake in the project and ongoing quality problems have led to delays as existing onsite labor is redirected to remedy the issues. The need to rebuild compressors and replace valves and piping after pre-startup quality checks further contributed to the delays and cost increases. Beach and its partner, Mitsui, are working on producing updated cost estimates and schedules as a result of the identified quality issues.

The plant at Waitsia is now expected to start up in the September quarter, delaying the project by nine months. The construction contract for the project was originally held by Clough Engineering, which was owned by South African firm Murray & Roberts. However, Clough entered voluntary administration in early 2022 after funding from its parent company was cut off. The future of the project seemed uncertain until Italian construction contractor WeBuild acquired Clough a few months later. Previously, Beach Energy had cut its Perth Basin reserves by 11 per cent due to disappointing drilling results.

Overall, the construction issues at the West Australian plant have led to significant challenges for Beach Energy and its partners. The increased costs and delays in the project startup have impacted the company’s shares negatively, resulting in a significant drop in early trading. Despite efforts to address and rectify the quality issues, the delays and cost increases continue to pose challenges for the project. News of the construction problems highlights the complexities and risks involved in large-scale energy projects and the importance of effective project management and oversight to mitigate such issues in the future.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest Email Telegram WhatsApp Copy Link

You Might Like

Array

Array

Array

Array

Array

Array

Editors Picks

RING LAUNCHES NEW AI-POWERED SMART VIDEO SEARCH IN THE UAE

3 months ago

Dubai Spotlight: Analyzing the Evolving Audience Tastes with AI Social Listening Tools in the UAE

4 months ago

مرآة التاريخ: تحليل البناء السردي للدروس الخالدة في قصص الأنبياء والإسلام

4 months ago

السندات الحكومية والشركات: أساسيات الاستثمار الآمن والدخل الثابت

5 months ago

UAE Ranks Among Top Rugby Markets on TOD as British & Irish Lions Tour Kicks Off

9 months ago

Latest News

Darven: A New Leap in AI-Powered Legal Technology Launching from the UAE to the World

9 months ago

Jordan to Host Iraq in the Final Round of the Asian World Cup Qualifiers After Securing Historic Spot

10 months ago

فلسطين: قلبٌ ينبض بالصمود والأمل

10 months ago
Advertisement
Facebook X (Twitter) TikTok Instagram Threads
© 2026 West Timelines. All Rights Reserved. Developed By: Sawah Solutions
  • Privacy Policy
  • Terms
  • Contact

Type above and press Enter to search. Press Esc to cancel.